galvanized steel grating
–> case study – Whistler
Whistler – Wood Framing
double bottom plate readied to accommodate radiant concrete topping
steel and wood connection
overhang at main entry – HSS steel frame
ceiling pot lights
double-height floor over kitchen
compound connection – note the sloping roof sitting on top of slanted I=beam
view towards upper floor deck
concrete floor and wood framing – prep work for radiant concrete topping
wood framing furred out to accommodate soffit
wood framing furred out to accommodate soffit
built up stud column
framed corner at deck guard
double height space at living room and kitchen
double height space at living room and kitchen
wall framing and sheathing
wall framing and sheathing
furred down framing to accommodate ceiling dry wall
fin wall at master bedroom deck
furred down framing positioned to accept wood soffit
fin wall at master bedroom deck
wall framing around a glulam beam
deck guard framing
tail rafters – glulam beams
living room space
looking from living room space towards main entry
Whistler – Overflow Scupper Details
overflow scupper
overflow scupper in curb off master bedroom deck
small deck off master bedroom
built up roof curb
Whistler – Baseplates
column connected (welded) to an embedded baseplate against a window jamb – the exterior side of curtain wall windows is nearest the viewer
steel column welded onto an embedded steel baseplate
radian heating topping in place
radiant heating topping in place
sill plate bolted to concrete foundation wall – note the (green) pressure treated plate against concrete
Whistler – Steel Frame
(see also steel connections, steel to wood connections and wood to concrete connections)
.
cantilevered steel frame
cantilevered steel frame
cantilevered steel frame
the same connection but from the opposite side. (See also Virtual Construction)
cantilevered steel frame
glulam to steel connection
glulam and steel beams
bolts inserted through steel beam web in preparation for the application of wood casing