Esquimalt – framing

only search this website

framing-01

shallow pre-fabricated trusses

framing-02

ceiling backframing

framing-03

pre-fabricated trusses

framing-04

framing-05

ceiling backframing over garage

framing-06

exit from living room to deck

framing-07

built-up-floor-over-joists

raised floor framing

diagonal-parallam-to-concre

Parallam to TJI angled connection

dropped-recessed-floor-fram

dropped framed floor

elevator-shaft-framing

wood framing around elevator shaft

parallam-to-tji-connection

Parallam to floor joist connection

plumbing-rough-in

plumbing rough in

plywood-wall-sheathing

Exterior wall plywood sheathing

roof-overhang-framing

Framed wall against concrete foundation wall – note the moisture membrane (black) between concrete wall and wood studs – normally one would leave a 1/2″ gap, but in this case the gap had to be eliminated

shallow-trusses

(Shallow) wood trusses

skewed-joist-connection

Skewed connection between a parallam beam and TJI joists

top-plate-vapor-retarder-va

Wall/floor framing

wall-and-floor-framing

framing-08

Wall/floor framing

FRAMING-01

FRAMING-02

FRAMING-FLOOR-04

floor build up over TJI floor structure

FRAMING-FLOOR-01

glue goop smeared over TJI beams in preparation of plywood sheathing application

FRAMING-FLOOR-02

glue goop as an adhering agent between floor plywood sheathing and TJIs

FRAMING-FLOOR-03

FRAMING-FLOOR-05

longish roof TJI beams

FRAMING-FLOOR-TJI

TJI close up

TIMBER-CONNECTION-02

TIMBER-CONNECTION-03

perimeter LVL ledgers (orange)

TIMBER-CONNECTION-04

extremely angled TJI beam – custom hangers?

WOOD-FRAMING-OVER-CONCRETE-01

WOOD-FRAMING-OVER-CONCRETE-02

sill gasket under sill plate to hamper moisture migration into wood

WOOD-FRAMING-OVER-CONCRETE-03

wall framing over a rather thin concrete foundation wall

WOOD-FRAMING-OVER-CONCRETE-04

garage wood framing offset from concrete wall and fill