exterior concrete slab prepped up for pouring
the blue insulation board along the curtain wall windows is a temporary blockout to create a 6″ wide trench drain which will be filled out with crushed rock
exterior concrete slab prepped up for pouring
the blue insulation board along the curtain wall windows is a temporary blockout to create a 6″ wide trench drain which will be filled out with crushed rock